UPS and Inverter Transformer Selection

Low-frequency transformers for UPS, inverter and energy-storage systems: crest-factor loads, battery recharge windings, isolation and the thermal margin that keeps a UPS alive during overload.

Why UPS designs still use a low-frequency transformer

A line-interactive or online UPS with a mains-frequency transformer isolates the DC bus from the load, blocks DC injection, and gives the inverter a clean, low-impedance source to switch against. It also provides the voltage translation the battery stack cannot, and can carry a second winding for the charger. High-frequency designs save weight; transformer-based designs survive overloads and inrush far better — which is what buyers actually notice.

What the transformer has to survive

  • Non-linear load. Switch-mode loads draw current in peaks, not sine waves. Crest factors of 2.5–3 are normal; specify the transformer for that, not for the VA number alone.
  • Overload. A UPS is expected to carry 125–150% for a minute and 200% for seconds. The transformer's thermal design decides whether that is possible.
  • Inverter switching. PWM edges stress winding insulation; low leakage inductance keeps the output waveform clean.
  • Charger windings. Extra secondary for battery recharge, with its own current rating and isolation.

How to specify it

Send the UPS topology (online, line-interactive, delta conversion), DC bus voltage, output voltage and phase configuration, kVA rating, overload profile, crest factor of the target loads, and whether a charger winding is needed. For solar and storage inverters, send the DC input window and the grid voltage — we build step-up and isolation transformers for both. Typical builds sit between 600 VA and 1000 kVA, Class F or H, AN or AF cooled.

Related pages

Talk to an engineer

Describe the symptom you are chasing — the noise, the trip, the heat, the space you have — and we will come back with a transformer proposal rather than a catalogue part. Send drawings or a target price and we normally reply within 24 hours on working days.

Contact our sales engineers →  |  Request a formal quotation →

Why NRE

NRE has manufactured transformers since 1994, with plants in Guangdong and Hubei covering nearly 100 mu and 62,700 m². Annual capacity is about 8 million toroidal transformers, 30 million EI transformers and 200,000 special transformers, with close to 150 engineers on the design and process side. We build to print, to specification, or from a problem description.